Skip to main content

Daily UAP/UFO news · gov drops · sightings · witness accounts

Missing a source? Suggest one →
← PURSUE Release 6
★Historically significant

This document is the primary contracting Statement of Objectives for AAWSAP, the DIA program (2008–2012) that funded UAP-related research including studies later associated with AATIP, representing one of the earliest known official government frameworks explicitly commissioning research into breakthrough aerospace physics including spatial/temporal translation.

DOW-UAP-D110, AAWSAP Statement of Objectives, July 2008

AAWSAP statement of objectives for far-term threats (2008)

Department of WarPDFAdministrativeLight redactionPURSUE Release 6
3/10

niche or mildly interesting

UAP Insight significance score

Location
Washington, D.C.
Incident date
7/18/2008
Released
September 18, 2026

UAP Characteristics

Government Programs Referenced

Official Description

This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This July 2008 Statement of Objectives defines AAWSAP as a contractor-supported research effort intended to assess far-term foreign aerospace threats by understanding the physics and engineering of possible breakthrough technologies out to the year 2050 rather than extrapolating from then-current aerospace trends. It identifies 12 technical study areas, including lift, propulsion, control, power generation, spatial or temporal translation, materials, configuration and structure, signature reduction, human interface, human effects, armament, and related supporting topics. The document also sets out the program’s expected work structure, requiring monthly status reports, technical-area program management plans within 60 days, comprehensive research reports and briefings by the tenth month, and a final integrated threat assessment.

Key Findings

  • →The DIA's Acquisition Support Division (DWO-3) established AAWSAP to assess foreign aerospace threats and breakthrough technologies out to the year 2050, explicitly focused on discontinuities rather than extrapolations of current technology.
  • →The program identified 12 technical study areas including lift, propulsion, control, power generation, spatial/temporal translation, materials, configuration/structure, signature reduction, human interface, human effects, armament (RF and DEW), and supporting peripheral areas.
  • →Contractors were required to obtain Top Secret/SCI facility clearances through the Defense Security Service, with personnel cleared through DIA/DAC-3 prior to accessing classified information.
  • →Deliverables included monthly status reports, 60-day project management plans per technical area, comprehensive research reports by the 10th month, and a final integrated threat assessment at contract end.
  • →The contract was structured as a firm fixed price (FFP) with a base year of 12 months plus four 12-month option years, for an anticipated total period of 5 years.
UAP Insight Analysis— AI generated, not official

This document is the Statement of Objectives (SOO) for the Advanced Aerospace Weapon System Applications Program (AAWSAP), dated 18 July 2008, issued by the Defense Intelligence Agency's Acquisition Support Division (DWO-3). It defines the scope, requirements, security classifications, deliverables, and contract structure for a contractor-supported research program aimed at assessing far-term foreign aerospace threats and breakthrough technologies through the year 2050. The document is purely administrative and programmatic in nature, containing no UAP incident reports or observational data.

Analyst Notes

This is a purely administrative contracting document (Statement of Objectives) with no UAP incident content, observational data, or witness accounts. Key Government Personnel names are redacted. The document's relevance to UAP research is indirect — AAWSAP is associated with UAP-related studies, but this SOO itself contains no UAP-specific content.

Extracted Entities

Agencies & Organizations

Defense Intelligence Agency (DIA)Acquisition Support Division (DWO-3)Department of Defense (DoD)Defense Security Service (DSS)DIA/DAC-3

Dates

18 July 2008

PDF not loading? Open directly ↗

Open PDF in new tab ↗

AI analysis by claude-sonnet-4-6 · September 19, 2026

Full transcript · 4 pages

Machine transcription by Claude Haiku 5.5 — it may contain errors; check the original. Redacted text stays redacted.

Show the transcript
Page 1 ↗
STATEMENT OF OBJECTIVES
FOR THE
ADVANCED AEROSPACE WEAPON SYSTEM APPLICATIONS PROGRAM
18 July 2008
PAN: #

1. BACKGROUND: The Acquisition Support Division (DWO-3) of the Defense Intelligence Agency (DIA) has the responsibility to provide guidance and oversight to the Department of Defense (DoD) acquisition process along with leveraging the DoD Intelligence Community to coordinate, produce and maintain projections of the future threat environment in which U.S. air, naval, ground, space, missile defense and information systems operate. In order to accurately assess the foreign threat to U.S. weapon systems, a complete as possible understanding of potential breakthrough technology applications employed in future acrospace weapon systems must be obtained.

2. OBJECTIVE: One aspect of the future threat environment involves advanced aerospace weapon system applications. The objective of this program is to understand the physics and engineering of these applications as they apply to the foreign threat out to the far term, i.e., from now through the year 2050. Primary focus is on breakthrough technologies and applications that create discontinuities in currently evolving technology trends. The focus is not on extrapolations of current aerospace technology. The proposal shall describe a technical approach which discusses how the breakthrough technologies and applications listed below would be studied and include proposed key personnel that have experience in those areas.

3. REQUIREMENTS:

a) The contractor shall complete advanced aerospace weapon system technical studies in the following areas:

1. lift
2. propulsion
3. control
4. power generation
5. spatial/temporal translation
6. materials
7. configuration, structure
8. signature reduction (optical, infrared,
radiofrequency, acoustic)
9. human interface
10. human effects
11. armament (RF and DEW)
12. other peripheral areas in support of (1-11)
Page 2 ↗
b) It is expected that numerous experts with extensive experience (minimum of 10 years) in breakthrough aerospace research and development will be required to meet the demands of the above program. The offeror should clearly identify their approach to obtaining the services of and their utilization of these scientific and technical experts. Management personnel must include a lead integrator to oversee the work of the various analytical teams, and to integrate their findings into final coherent products. At least one member of each analytical team must have a PhD, although that member can be on several teams. A technical plan for conducting the advanced aerospace weapon system studies described above must be included in the offeror's proposal.

(c) Offeror must be able to produce integrated finished assessments in each of the above advanced aerospace weapon system technical areas. Finished reports and presentations, while highly analytical and technical, must be in a format suitable for dissemination at the highest levels of the federal government. In addition to the main technical section of each assessment, an executive summary utilizing clearly understandable (non-technical) language must also be contained in each report.

(d) To assess relevant experience, offerors shall submit at least three (3) references, including a POC name and phone number, with a brief description of the business relationship with the Government or other corporations. In addition, offerors should provide examples, conducted within the past 7 years, of having performed, as a prime contractor, the analysis, design, construction, and flight testing of high performance aircraft and/or satellites. Success in this program is dependent upon this capability and experience.

4. PLACE OF PERFORMANCE: The work under this contract shall be performed at the Contractor's facility.

5. SECURITY REQUIREMENT: Contractor company and personnel proposed shall be clearable and able to obtain a security and facility clearance upon award of the contract. All requirements specified in this SOO may be based on materials classified at or below Top Secret with access to Sensitive Compartmented Information (TS/ SCI). The contractor shall comply with the terms and conditions of the DD-254 BEFORE initiating any classified effort. The contractor shall notify the COR and Contracting Officer immediately upon the determination that higher classification requirements exist in order to accomplish the specified requirements. The contractor shall ensure that each individual assigned to this contract shall be identified, cleared, and approved through DIA/DAC-3 PRIOR to granting that individual access to, or authority to generate classified information in association with this effort.

5.1. Contractor shall provide a work facility (including unclassified information systems) with a Top Secret Facility Clearance granted by the Defense Security Service (DSS). Cleared facilities are not required at contract inception. Offeror must provide personnel eligible for a Top Secret clearance level with further eligibility for SCI access. At least two personnel cleared at the Secret level are required at contract inception.

6. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT: The Government will provide the contractor access to computers and peripherals such as printers as the Government deems necessary to access and produce classified information. These computers and peripherals remain the property of the Government.
Page 3 ↗
7. GOVERNMENT FURNISHED INFORMATION/DATA: Data required by the contractor to fulfill the terms of this contract shall be requested from the Government Project Lead (GPL). A good faith effort will be made to fulfill any legitimate request (as assessed by the GPL), however, the responsibility to collect information and data necessary for the conduct of this effort remains with the contractor. Any classified data provided by the Government in support of this contract will remain the property of the Government and will be returned to the government not more than 30 days after contract conclusion.

8. CONTRACTOR ACQUIRED / GOVERNMENT OWNED PROPERTY:
Any accountable property acquired by the contractor with government funds during the execution of this contract shall become government owned property. The contractor shall obtain written permission from the CO or Contracting Officer Representative (COR) prior to any purchase of real property with government funds. The contractor shall establish and maintain an inventory of all such property. This property must be inventoried and returned to the government not more than 60 days after the end of the contract.

9. EQUIPMENT LEASE OR PURCHASE:
The purchase of equipment is preferred, however, it may be more advantageous to the government to lease in certain circumstances. When it is contemplated a lease would be more advantageous to the government, contractor shall furnish the following information to the COR so the government can determine the best solution:
1. Estimated length of time the equipment will be used and the extent of use within that period
2. Financial and operating advantages of alternative types and makes of equipment
3. Cumulative rental payments for the estimated period of use
4. Net purchase price
5. Transportation and installation costs
6. Maintenance and other service costs

10. TRAVEL: It is anticipated that travel will be required for this contract. The Government will pay up to the rates specified in the government Federal Travel Regulations for travel destination. Travel reservations will be made by the contractor and will be reimbursed for actual costs only, with supporting documentation/receipts attached to the invoice.

11. DELIVERABLES: The contractor shall prepare the following deliverables:

a. Status Reports - monthly reports outlining accomplishments, milestones, and work in progress.

b. Project Management Plan – For each technical area, the team lead shall submit, at the 60 day point, an overview paper identifying the scope of the final report; a Plan of Action and Milestones, and the composition of the analytical team.

c. Research Reports For each technical area, a comprehensive report and briefing forecasting potential advancements and their impact is to be submitted to the GPL by the end of the tenth month. An executive version of each report should also be submitted. Format will be specified by the GPL.

d. Integrated Threat Assessment – A final report and briefing that assesses the foreign threat from advanced aerospace platforms incorporating the technologies discussed in the individual research reports will be
Page 4 ↗
provided to the GPL at the end of the period of performance. An executive version of the report should also be submitted. Format will be specified by the GPL.

e. Resumes - The Contractor shall submit resumes of all key personnel proposed for this effort. The Government reserves the right to review resumes and qualifications prior to acceptance of individuals for assignment.

12. PERIOD OF PERFORMANCE: The term of this contract shall is anticipated to be 5 years which consists of a base year of 12 months from date of award plus four (4) 12 month option years.

13. CONTRACT TYPE: The contract shall be firm fixed priced (FFP).

14. KEY GOVERNMENT PERSONNEL: The Contracting Officer for this contract will be (b)(3):10 USC 424, (b)(6) The COR and Government Project Leader will be [REDACTED]

15. DEFINED TERMS:

Key personnel - defined as proposed management and lead science and engineering staff.

Contracting Officer Representative (COR) – The government official appointed by the contracting officer and who is responsible for operations of the execution of the contract. The COR handles all aspects dealing with the interpretation and deliverables of the contract.

Contracting Officer – Procurement official who holds a contracting warrant and is authorized to obligate the government under the terms of a contract and make changes to the contract.

Get the next PURSUE release in your inbox

We check war.gov every day. When a new PURSUE release drops, you get an email within a day: what's in it, in plain English, with links to the files. Plus a short Friday digest of the week's top UAP stories.

By subscribing you agree to our Privacy Policy. Unsubscribe any time.